Steam, salt air and shaded walls give mould plenty to work with in Illawarra homes. Mould resistant painting in Wollongong starts with finding the moisture, cleaning the surface properly and then using a primer and paint made for wet areas. Our Wollongong painters page lists the areas we cover.
Fully licensed and insured painters with 10+ years in the trade.
Cracks, salts and failed paint are dealt with before any coating goes on.
Systems chosen for salt air and Illawarra humidity.
A site inspection and a free, no-obligation quote.
Bathrooms and laundries have the hardest life of any room in the house. Paint here has to cope with steam, splashes and regular cleaning, and it only works if the surface under it is sound.
Picking colours for a bathroom? We can help you choose tones that suit the light and the fittings.
Homes between the sea and the escarpment hold moisture longer than most. Houses in Helensburgh and Thirroul can stay damp through humid spells, and the bathrooms and laundries inside them tend to show it first, as black spotting on ceilings and grout lines.
WM Painting & Decorating is licensed and insured, with 10+ years in the trade. Mould-resistant work sits inside our wider interior painting service, and tired laundry cabinets and vanities can be handled under kitchen cabinet painting. Landlords with damp-marked properties can read about rental and end-of-lease painting.
Different rooms need different systems. These are the cases we see most.
Ceilings catch steam and are the first place mould shows. We clean and treat the mould, let the surface dry, prime with a mould-blocking primer and finish with a ceiling paint made for kitchens and bathrooms.
Walls need a washable, low sheen finish that copes with splashes. We repair damaged areas, prime and apply two coats of a bathroom wall paint, taking care around tiles, windows and fittings.
Laundries combine steam, lint and damp towels. A mould-resistant paint helps, along with an extractor fan or an open window when the dryer is running.
Mould and algae also grow on shaded, damp exterior walls. We wash them with a suitable treatment, let them dry fully and then apply an exterior system. Our exterior painting page covers the wider job.
No. Paint over live mould and it can grow back through the new coat. Taubmans’ technical advice on bleeding, efflorescence and mould says to remove mould with a bleach-based cleaner and rinse the surface thoroughly, then use a mould-blocking primer and finish with a mould-resistant topcoat. Haymes gives the same basic advice in its bathroom paint guide: remove any mould completely before painting.
We follow that order. The affected areas are cleaned and treated and left to dry, loose paint is scraped off, holes are filled, and a primer goes on before any topcoat.
Haymes advises against standard interior paints for wet areas such as bathrooms and laundries, and suggests looking for mould and mildew resistance, washability, strong adhesion and a low sheen finish. Each of the big brands has a range for this. The Dulux page on treating and preventing mould lists Wash&Wear +PLUS Kitchen & Bathroom for humid areas, Ceiling White +PLUS Kitchen & Bathroom for ceilings and a Stain & Mould Blocker primer. Taubmans and Haymes sell comparable systems.
Some of these products carry a manufacturer guarantee against mould growth. Dulux’s page, for example, lists a 10-year guarantee, with a note to refer to the product label for the full conditions. Those are the manufacturer’s terms, not ours. Which product suits your room depends on the surface and the finish you want, and we recommend one when we quote.
Paint slows mould down. It does not fix the conditions that cause it. The Haymes guide notes that poor airflow keeps surfaces damp for longer, and that ventilation matters during and after painting.
In practice that means running the extractor fan during showers and for a while afterwards, opening a window when you can, wiping condensation off glass and tiles, and not drying wet towels in a closed bathroom. If your bathroom has no fan, or the fan only blows into the ceiling space, ask an electrician or builder about proper ventilation. We note where moisture is building up during the inspection and tell you what we see.
Brown stains that keep growing, soft or swollen plasterboard, repeated bubbling or a musty smell near a shower can point to a leak. In that case new paint only covers the symptom for a while. A leaking shower, a failed waterproof membrane, a blocked gutter or a roof leak needs a licensed plumber, waterproofer or roofer first.
We will tell you when a repair should come before painting, and we are happy to return and paint once it is fixed. For salt and damp on exterior masonry, our render and brick painting page covers that side.
Preparation takes longer than painting. Mould is cleaned and treated, loose paint is scraped, cracks and holes are filled, and the area is washed and left to dry fully. Then comes a stain-blocking or mould-blocking primer, followed by two coats of topcoat with the recommended time between coats. Rushing any step is what brings the mould back.
Afterwards the room needs to stay ventilated, and steam kept out until the paint has cured. Product data sheets give the cure time, so we check the sheet for the paint we used and tell you when the shower is safe to use again.
Tell us about the room and the mould, and we will arrange a free, no-obligation quote.
We inspect the surfaces, check for moisture sources and recommend a paint system.
Mould is cleaned and treated, damaged paint is repaired and the surface is left to dry.
Primer and topcoats go on in the order the manufacturer specifies.
We check the finish with you and explain how to keep the room ventilated.
Call 0434 432 267 or send us a message for a free quote on bathroom and mould-resistant painting across Wollongong and the Illawarra.
A low sheen, washable paint made for kitchens and bathrooms, applied over a mould-blocking primer, suits most bathrooms. Dulux, Taubmans and Haymes all make ranges for this, and we recommend one for your room when we quote.
It helps, but only when the mould has been cleaned off first and the moisture source is dealt with. Good ventilation is a big part of it.
Yes. We clean and treat mould on ceilings and walls as part of the preparation, then prime and repaint. If it keeps returning, the cause is usually moisture, and we will say so.
Usually, yes. Doing both at once gives a consistent finish and means we only need to prepare and cure the room once.
Product data sheets give the cure time, so we check the one for the paint we used. We ask you to keep steam out of the room until the paint has cured, and we tell you when that is.
Stains that grow, soft or swollen plasterboard, a musty smell near plumbing or marks that follow wet weather all point to a leak. Have a licensed plumber or roofer check it before we paint.